Designed for

reMarkable 2 Project Planner

Original price was: $16.00.Current price is: $8.00.

-50%

Elevate your project management with our meticulously designed for reMarkable 2 Project Planner template.

Grab Yours Now!

Guaranteed Safe Checkout


Elevate your project management with our meticulously designed for reMarkable 2 Project Planner template.

🚀 Want more for less? Unlock your full potential with our Productivity Bundle – a collection of 5 best-selling templates for reMarkable 2 (including this one). Grab it now at a massive discount: tablettemplates.com/remarkable-productivity-bundle-discount/

Featuring an extensive 812 pages, this tool is crafted to help you oversee every aspect of your projects with precision and efficiency.

1. 📝 CONTENTS
This reusable document has a total of 812 fully hyperlinked pages, containing:
✔️ Index (1 page) – Navigate effortlessly with a hyperlinked overview of all your projects and their statuses.
✔️ Project Overview (30 pages) – Track start & due dates, manage budgets, and monitor progress with our comprehensive layout. Includes a “Main Tasks” table, checklist for 10 main tasks and 15 subtasks each, and sections for essential items and costs.
✔️ Project Main Tasks (300 pages) – Dive deeper into your main tasks by creating subtasks and prioritizing.
✔️ Brainstorm (150 pages) – Capture creative ideas on 5 dotted pages per project.
✔️ Notes (150 pages) – Document critical information on 5 note pages for each project.
✔️ Timeline (150 pages) – Visualize your project’s timeline with a 30-week Gantt chart.
✔️ Sticky Notes (30 pages) – Use sticky notes for quick reminders, to-do lists, and important project details.
✔️ Cover (1 page)

The template is reusable and each can hold 30 projects.

2. 💎 DESIGN
The template was meticulously designed with a focus on simplicity and ease of use, ensuring a smooth and effortless reMarkable 2 note taking experience for even the most novice users.
It has an optimized size of only 2MB and a fast loading speed.

3. 🖌️ CUSTOMIZATIONS
The following variants are all available without any extra cost:
✔️ Right-Handed / Left-Handed
Other customizations can be made for specific needs. Please contact in advance to check if additional costs are required.

    4. ✋ TEMPLATE LIMITATIONS
    All custom and hyperlinked templates, such as ours, are PDF documents. While they offer unmatched functionality & design, certain reMarkable features are not available in PDF format yet.

      reMarkable hasn’t introduced the following features to PDF documents yet:

      • handwriting conversion to text
      • compatibility with the type folio or typed text
      • ability to change background design, as with the native, inbuilt templates

      Please keep these limitations in mind before purchasing any of our templates.

      5. ⚖️ LICENCE
      All our designed for remarkable 2 templates are for personal use only. Please do not distribute, modify or resell. All copyrights and intellectual properties belong to TabletTemplates.

      reMarkable, its associated trademarks, logos and copyrights are the property of reMarkable. This shop is neither endorsed nor sponsored by reMarkable, and the developer of these templates is not affiliated with reMarkable.